Wednesday, July 05, 2006


One more light that needs installed. Maybe next weekend. Posted by Picasa


Looking the other direction. Need to have the texture person come and texture our downstairs ceiling. Posted by Picasa


The results! A well lite room with a new fan! Posted by Picasa


Lights are in. Now to plug up the access holes. Posted by Picasa


Holes for the new recessed lighting. Plus a few extra! Posted by Picasa


After a bit of cleanup! What a mess. Posted by Picasa


Onto the living room. Or back to the living room. However you look at it. We removed the rest of the popcorn ceiling downstairs. Posted by Picasa


Also water made it under the sink wall and got the boards in the corner by the stove. We fixed that the following weekend. Posted by Picasa


After a weekend of work it was back to new.  Posted by Picasa


We pulled the boards up in the hallway to the front door when it happened and saved them. The bathroom and hall outside the bathroom were damaged. Posted by Picasa


The bathroom and entry hallway took a swim. To bad we were in the panic "ARGH get the water up" mode to have grabbed the camera to take a picture of our daughter turning the sink into a water table. Posted by Picasa


What do you get when you mix and 18 month old, a newly plumbed sink and tiolet paper? In our case 3 minutes of fun that results in 2 weekends of cleanup.  Posted by Picasa

Monday, April 24, 2006


Across from the toilet hang this cabinet. Also we added new switches to seperate the fan from the lights. On order are the sink facuets. We need to find some brushed nickle pulls and hindges for the cabinet & mirror . Posted by Picasa


Nice new bathroom. Posted by Picasa


After Posted by Picasa


Before Posted by Picasa


After Posted by Picasa


Before Posted by Picasa


Flooring - Check! Woahoo, the whole downstairs is now floored! Posted by Picasa


New light fixture and paint - check! Posted by Picasa


Wow they make this handy little splatter tool for re-texturing the wall. Worked well except the knockdown ended up a little smaller that the surrounding. O well it will be behind the sink and in the end looks just fine. Posted by Picasa


All serious weekend projects require drywall repair! Moved the plumping closer together for the pedestal and installed bracing 2x4 for the sink. Fixed the hole I made behind the tiolet removing the linolium and the old toilet paper holder that was in the wall. Posted by Picasa


The linolium was a pain to remove off the floor! Posted by Picasa


Even Caeden got in on the demo action. Posted by Picasa


Typical first step: Remove all contents of the room! Posted by Picasa